IdRegistro IdAlmacen IdProducto Descripcion Unidad VrPromedio Disponible VrActual Costo de Reposicion
26 01 5_01_4 Cemento normal gris tipo I en saco t 52,083.33 0.00 0.00 50,000.00
36 01 5_02_2 Cemento portland IP-30 kg 31,666.66 0.00 0.00 12.00
1656 01 13_02_02 Ceramica duropiso 30x30 M2 160,000.00 0.00 0.00 0.00
27 01 5_01_5 Clavo de 2 1/2" a 3 1/2" kg 0.00 0.00 0.00 32,000.00
39 01 5_02_5 Clavos de 2 1/2 pulg kg 0.00 0.00 0.00 1,300.00
6 01 1_02_3 CODO TUBER�A PVC 6` RDE 26 UND 0.00 0.00 0.00 42,732.00
73 01 13_01_15 COLOR MINERAL kg 0.00 0.00 0.00 5,800.00
66 01 13_01_3 Concolor KG 0.00 0.00 0.00 3,950.00
43 01 7_01_1 CONCRETO CORRIENTE 2500 PSI m� 0.00 0.00 0.00 288,492.00
3 01 1_01_4 CONCRETO CORRIENTE 4000 PSI m� 378,676.20 0.00 0.00 360,644.00